Change one company and one standard
- Check the company scope at the top, then use Search companies… to find the company.
- Find the intersection of its row and the intended standard column. Read the category and item name, especially when similar names exist.
- Right-click the status cell. Check that the menu header identifies the correct company and standard.
- Select the status or configured deployment option. This saves immediately; there is no second confirmation or Save button.
- Wait for the result, then reopen the matrix and check the linked Planner item where present.
Choose the recorded status
Choose a deployment option
When the MSP has configured deployment options, the cell menu lists them under tier headings. Select the actual implementation. Choosing an option also marks the standard Deployed. Use Deployed — option not specified when the deployment is known but its implementation is not classified. This clears the selected option for that cell. With no configured options, the simpler Mark Deployed appears. Changing to In Progress, Not Started, N/A or Declined does not necessarily erase the previously selected option. Review the option when marking the item Deployed again. A deployment below the target can remain Deployed; its tier shows that an upgrade is still needed.Verify the change
A cell updates on screen before the complete save finishes. Read any error, refresh the page and compare it with the linked Planner work. A status update can save in Standards while the later Planner update fails; a visible rollback or error does not guarantee every stored change was undone. These menus do not edit notes. A single-cell update can clear an existing stored Standards note. If your team relies on those notes, verify them after changing the status. Linked Planner public and private notes are separate from that Standards note. If the cell has no linked task, changing status can create or update tracking without creating Planner work. Ask the MSP administrator to review Standards sync rather than repeatedly clicking the cell. For several changes, read Update Standards in bulk first. Its company and column menus have broader scopes.FAQs
Where can I mark a standard Deployed for one company?
Where can I mark a standard Deployed for one company?
What permission is needed to update the matrix?
What permission is needed to update the matrix?
Does selecting a status need another Save?
Does selecting a status need another Save?
Why does a normal click open Planner instead?
Why does a normal click open Planner instead?
What is the difference between N/A and Declined?
What is the difference between N/A and Declined?
Does Mark Deployed install the product?
Does Mark Deployed install the product?
How do I classify which implementation a company uses?
How do I classify which implementation a company uses?
How do I clear a deployment option while keeping Deployed?
How do I clear a deployment option while keeping Deployed?
Does changing away from Deployed erase its option?
Does changing away from Deployed erase its option?
Can a direct matrix edit replace On Hold in Planner?
Can a direct matrix edit replace On Hold in Planner?
Does changing a cell create its missing Planner item?
Does changing a cell create its missing Planner item?
Can a failed change have partly saved?
Can a failed change have partly saved?
Are existing notes always preserved by a single-cell status edit?
Are existing notes always preserved by a single-cell status edit?