Read quantities and unit costs
Each row contains a quantity, a unit amount and a recurrence. The row’s planning amount is quantity × unit amount. When quantity differs from 1 and the amount is positive, a total appears beneath the row. A quantity of 3 at 250 means 750 for that row. A separate quantity of 2 at 40 Monthly means 80 per month. Keep these cadences separate; adding them as 830 does not produce an annual budget.MSP editor with a synthetic unsaved example: 750 one-time and 80 monthly. Save applies the estimate.
Add or change cost rows
- Open the item with editing access.
- Enter a positive Qty and the nonnegative unit amount under Costs.
- Choose One-time, Monthly or Annual for that row.
- Choose Add cost for another row. An item supports up to 20 rows.
- Review each row’s quantity, amount and cadence, then choose Save in the item dialog.
Hours and probability
Est. Hours is a nonnegative effort estimate. The number control supports quarter-hour increments, such as 1.25. Clearing it saves a zero estimate. It does not create time entries or assign staff capacity. Probability of Success ranges from 0% to 100% in 5-point slider steps. It helps calculate expected value and risk-adjusted projections. A new item starts at 50%; changing probability does not change Status or Business Value. Probability is a planning estimate, not a promise or a percent-complete measurement. Planner Analytics treats completed and cancelled work differently when calculating expected value; see Understand Analytics charts.Check currency and loading problems
Check the displayed currency code before entering amounts. If the editor’s code differs from the company’s currency shown elsewhere, ask the MSP to resolve the mismatch before relying on the figures. The editor does not offer an exchange-rate conversion control. If cost loading fails, use the displayed Retry control. Save is unavailable while required cost or custom-field data is not ready. Do not replace an estimate with zero merely because its data has not loaded.FAQs
Where do I change a Planner item's estimated cost?
Where do I change a Planner item's estimated cost?
Does Costs contain a unit price or the complete row total?
Does Costs contain a unit price or the complete row total?
Can one item include both one-time and monthly costs?
Can one item include both one-time and monthly costs?
Is a Monthly amount already the annual total?
Is a Monthly amount already the annual total?
How many cost rows can an item have?
How many cost rows can an item have?
Why can I not remove the final cost row?
Why can I not remove the final cost row?
How do I enter zero cost?
How do I enter zero cost?
Does changing a cost or hours field save immediately?
Does changing a cost or hours field save immediately?
Does Probability of Success measure completion progress?
Does Probability of Success measure completion progress?
Does the cost editor convert between currencies?
Does the cost editor convert between currencies?
What should I do when costs fail to load?
What should I do when costs fail to load?