Before you start
- You need access to the project.
- Hours and time details depend on what your MSP shares. Company users do not see detailed time history.
- A project with no phases and at most one ticket uses the simpler Client Dashboard instead of this list. MSP editors of native projects always see Tasks.
Find the work
1
Open Tasks
Open Projects, click the project, then click Project Plan and Tasks.
2
Search or filter
Type in Search tasks… to filter by task. MSP staff can use the Owner menu to show All tasks, MSP tasks, or Client tasks. Use the Source menu to show All sources, PSA, MSPortal, or Both: Both lists PSA tickets linked to portal tasks, plus every task in a phase that exists in both. When a project has more than one portal, pick it from the Portal menu in the same bar. On a wide screen, the Task index on the left jumps to a phase or task.
3
Open a phase
Click a phase to expand it. Each phase shows its status icon, name, source badges, how many tasks are done (for example “2/5 tasks”), its status, and a progress bar. A PSA phase and a portal phase with the same name show as one phase with both PSA and MSPortal badges. The flag icon links to the phase’s milestone; hover it to see the milestone name. Unphased Tickets, when present, lists tickets with no phase.
4
Read a task row
Each row shows the title, a status badge, the ticket number, the owner, the end date (or start date), and hours as logged/budget. A struck-through title with a green check is a closed task. Staff may also see an Internal or Not scheduled badge.
5
Open the details
Click a task title to open its ticket details. Custom fields and, when your MSP turns on time entries, recent time entries show under the row.
Understand the numbers
Zero or missing hours do not mean no work happened. Hours may be unshared, unavailable, or not yet synced. Ask your MSP if totals look wrong.
Read time details (MSP staff)
When time entries are turned on in project display settings, MSP staff see a task’s entries under its row, with Date, Person, Duration, Type, Notes, and Billable. Click Load more when another page exists. Check data flags entries whose total is zero. Billable is not an invoice. Company users do not get this detail. Ask your MSP for a shared summary.Control task visibility and scheduling (MSP staff)
1
Open the task's menu
Click Ticket actions on the task row and choose the Visibility and scheduling option.
2
Choose the controls
Turn on Internal only to hide the task from Company users everywhere in MSPortal. Turn off Include in scheduling to keep it off the Dispatch board, out of its planner and Smart Schedule, and off the Gantt. The task, its bookings and its dependency links are kept and come back when you turn it on again.
3
Reset to the default
Click Use type default to remove an individual override. Each change saves at once, and the same switch undoes it.
Find and assign unassigned tasks (MSP staff)
1
Open the unassigned tasks
On Overview > MSP Dashboard, click Unassigned open tasks. Tasks opens in the table view, filtered to open tasks with no owner. In the table you can also set the Owner filter to Unassigned yourself.
2
Select the tasks
Tick the checkbox on each task, or tick the header checkbox to select every task the filters show. A task you cannot assign has a disabled checkbox.
3
Assign them
The table header shows how many tasks are selected and one picker for each kind of task in the selection:
- Assign staff sets a staff member on your client portal tasks. Choose Clear assignment to remove it.
- Assign contacts sets portal contacts on the client’s own portal tasks. Pick contacts, or click Select all, then click Assign to N tasks. With no contact picked, the button reads All contacts and returns the tasks to the default, where every portal contact can see them.
- Assign owner sets the owner of PSA tasks, including portal tasks that were sent to your PSA. It lists the people your PSA allows on the project and writes the change to your PSA.
Troubleshooting
Frequently asked questions
Does a full progress bar mean the phase is finished?
Does a full progress bar mean the phase is finished?
The bar counts closed tasks. At 100% every task in the phase is closed.
Can I open a support ticket from these rows?
Can I open a support ticket from these rows?
No. These rows are existing project work. To ask for help, use the Home AI Assistant. See Open a ticket.
Why can Company users not see time notes?
Why can Company users not see time notes?
Detailed time history is for MSP staff. A zero-entry result for a Company user reflects access, not missing work.
Why are tasks from an old client portal not listed?
Why are tasks from an old client portal not listed?
Tasks an archived client portal sent to your PSA are left out of the project, along with phases that held only those tasks. They stay in your PSA. Unarchive the portal to bring them back.